AXEL SPRINGER BERLIN

Radical asethetics

The atrium facade covers an area of 3,250 sqm.

GIG developed a steel and glass construction that was largely prefabricated, with a total of 300 tons of steel being used.

Realized by GIG:

3,250 sqm  bespoke steel-glass atrium facade

750 sqm  aluminum-glass facade for level 5 as well as groundfloor facades

 

 

Location:
Berlin, DE
Solution:
Steel & Glass
Customer:
Ed. Züblin AG
Architect:
OMA Architects
Award:
Realisation:
GIG FASSADEN